We produce cyclones, gas channels, mill bodies, kiln shells and project-based special steel parts as welded manufacturing. Dimension control is part of manufacturing; The part comes out ready for assembly.

Every piece to be installed in the field is rehearsed in the workshop. Since the connection points are pre-assembled, there are no surprises on the construction site, and assembly time is shortened.

Tüprag Efemçukuru steel installation

Period

Manufacturing flow

  1. 01

    Welding plan

    Stitch types, order and shrinkage allowances are determined; The sequence that will reduce distortion is planned.

  2. 02

    Tack welding and dimensional check

    The parts are spot-on on the apparatus, and the geometry is measured before welding.

  3. 03

    Welding and trial fit

    Stitches are completed; The groups that will unite in the field are checked with a rehearsal assembly in the workshop.

  4. 04

    Inspection and shipment

    After measurement and welding control, the parts are marked and shipped.

Technical information

Capacity and working range

  • Parts producedCyclone, gas channel, mill body, kiln shell
  • Welding planStitch type, order and shrinkage allowances are predetermined
  • Warp checkSpotting on the apparatus, measurement before welding
  • Trial assemblyGroups that will unite in the field are tested in the workshop
  • Parts that are difficult to transportManufactured on site at the construction site
  • Delivery methodProof-assembled, marked part
  • Welding methods and certificationsTo be added

Dimensions and capacity values of the machinery will be added.

Projects featuring this work

All references