Ankara–Sivas High Speed Train Project — Pedestrian Crossing Bridge Manufacturing and Installation

About the project

Steel fabrication and installation of the pedestrian crossing bridge within the scope of the Ankara-Sivas High Speed Train Project.

  • LocationSivas
  • Year2022
  • Field of workSteel Structure and Buildings

Services provided

Ankara–Sivas High Speed Train Project — Pedestrian Crossing Bridge Manufacturing and Installation — 1/3

Similar projects

All references