Drilling

What we do

Hole location is more important than hole diameter

We carry out hole, countersink and tapping operations according to project dimensions. We base the connection holes on position accuracy before diameter; This is where the problem of not retaining bolt holes in the field arises.

We use templates for repeated groups of pieces. Thus, all parts in the same connection group can be installed interchangeably.

Çimentaş Elazığ ringside shell change

Period

Drilling workflow

  1. 01

    Hole plan

    Connection groups are removed, hole diameters and positions are confirmed.

  2. 02

    Marking or template

    Marking is done on single pieces and templates are prepared on repeated groups.

  3. 03

    Drilling and countersinking

    Holes are opened; Countersink and guide operations are performed where necessary.

  4. 04

    Position check

    Hole positions are checked, interchangeability between groups of parts is verified.

Technical information

Capacity and working range

  • OperationsDrilling, countersinking and tapping
  • Basis measurePosition of connecting hole before diameter
  • Repeated groupsIt is drilled with a template, the parts are replaced with each other
  • Single partsDrilled with marking
  • ControlHole positions and group interchangeability are verified
  • Delivery methodPosition checked part
  • Hole diameter rangeTo be added

Dimensions and capacity values of the machinery will be added.

Projects featuring this work

All references