Post-Cutting Services

What we do

The part leaves ready for site

After cutting and bending, we carry out deburring, straightening and stress relieving operations. When these processes are skipped, pre-welding correction work occurs in the field; We close it in the workshop.

In works requiring surface preparation, cleaning before painting and coating is also carried out in this context.

Sönmez Çimento preheater kiln installation

Period

Order of operations

  1. 01

    Deburring

    Burrs and slag on the cutting surfaces are cleaned and the edges are prepared for welding.

  2. 02

    Straightening

    Distortions caused by heat are eliminated and the part is brought to its plane.

  3. 03

    Stress relieving

    Stress relief is applied to the necessary parts; Dimension shifting is prevented during assembly.

  4. 04

    Surface preparation

    If painting or coating will be done, surface cleaning is completed.

Technical information

Capacity and working range

  • ScopeDeburring, straightening and stress relieving
  • DeburringThe slag on the cutting surface is cleaned, the edge is prepared for welding
  • StraighteningDistortions caused by heat are eliminated
  • Stress relievingIt is applied to the required parts, preventing measurement shifting
  • Surface preparationCleaning is done before painting or coating
  • Delivery methodReady to install
  • Paint and coating classesTo be added

Dimensions and capacity values of the machinery will be added.

Projects featuring this work

All references